Lexicon
Engineering Change Order (ECO)
An Engineering Change Order (ECO), also referred as Engineering Change Note/Notice (ECN), is a document that specifies either new product design details or proposed changes to existing products. ECOs provide a list of all the components, assemblies, and other documents that are affected. It is a part of the Engineering Change Management (ECM).
